Modeling Project Characteristics on Construction Project Performance Based on Time Cost and Quality in Pt XYZ Regional Jabodetabek

EasyChair Preprint 7055

8 pagesDate: November 18, 2021

Abstract

PT XYZ is a railway transportation company. Many construction projects are implemented
to support its business in Jabodetabek. The construction projects in the Jabodetabek are 
carried out with different characteristics and influenced by many variables. While the owner 
(PT XYZ) want that the aspects of project performance are achieved. Project performance 
can be measured from many things such as cost, quality, social impact, etc. The purpose of 
this study are to identify and modeling characteristics project to performance based on time 
cost and quality. Literature review from previous study and expert discussion are methode 
to find variables and indicators. this study finds that project characteristics have correlation
to project performances. Furthermore, project characteristics variable are consist of project 
implementation system (X1) with 9 assessment indicators, the owner capability variable 
(X2) with 5 assessment indicators, the contractor capability variable (X3) with 10 
assessment indicators and the project external condition variable (X4) with 3 assessment 
indicators. Meanwhile, time performance (Y1), cost performance (Y2) and quality 
performance (Y3) have 2 assessment indicators.

Keyphrases: Project performances, project characteristics, structural equation model

BibTeX entry
BibTeX does not have the right entry for preprints. This is a hack for producing the correct reference:
@booklet{EasyChair:7055,
  author    = {Fariz Gilang Wahyu Ansharianto and I Putu Artama Wiguna},
  title     = {Modeling Project Characteristics on Construction Project Performance Based on Time Cost and Quality in Pt XYZ Regional Jabodetabek},
  howpublished = {EasyChair Preprint 7055},
  year      = {EasyChair, 2021}}
Download PDFOpen PDF in browser